R, it represents the first and only underground segment of the wider 31.32km Indore Metro Phase 1 project. The joint venture ...
Hindustan Construction Company Limited (HCC), in partnership with Tata Projects Limited (TPL), has won a US$254M contract for ...
The contract involves the construction of an 8.65-km-long underground corridor, including tunnels and stations, making it the first and only underground segment of the 31.32-km Indore Metro Phase 1 ...
Hindustan Construction Company Ltd (HCC) and Tata Projects Ltd have jointly won a Rs 2,191 crore contract from the Madhya ...
(HCC), along with its joint venture (JV) partner Tata Projects Ltd. (TPL), has bagged a ₹2,191 crore contract for the ...
The Hindustan Construction Company will build a 8.65 km long corridor including underground tunnels and stations for Madhya ...
Package IN-05R refers to the awarded contract for the underground section of the 31.32 km long Indore Metro Phase 1 project.
HCC and TPL win ₹2,191 crore contract for Indore Metro underground corridor, connecting key stations for city's ...
Ujjain: A conflict arose between an IRCTC vendor and a food plaza operator at Nagda railway station over supplying food on a ...
HCC shares surged 5.93 per cent to hit a high of Rs 23.95. The stock was last seen trading 3.58 per cent up at Rs 23.42. At ...
According to the statement, the package IN-05R is the first and only underground segment of the 31.32-km Indore Metro Phase 1 ...
Hindustan Construction Company Ltd in partnership with Tata Projects Ltd has bagged a Rs 2,191 crore contract from the Madhya ...